Manufacturing

F4E signs contract with TWI

Friction stir welding. Copyright TWI


F4E is to receive engineering support on joining and non-destructive testing activities of ITER components.

Testing components in a rigorous manner and identifying possible improvements before assembling them, is a fundamental step in a project as technologically complex as ITER. The need for leading expertise and knowledge transfer is high on the agenda.

In line with above considerations, a framework contract has been signed with TWI Ltd, the World Centre for Materials Joining Technology, for a maximum value of 800,000 EUR over a period of four years to provide F4E with know-how through engineering studies, assessments, technical audits and qualification procedures in the area of joining of components and non-destructive testing technologies.
 
The results will feed into the manufacturing processes of key structural components like the vacuum vessel and magnets, in-vessel components and the remote handling systems. In addition, modelling activities will be carried out in the areas of heat transfer, prediction of distortions and residual stresses. The F4E has already identified that the Vacuum Vessel and the TF coils will be amongst the first components to perform engineering activities within the framework contract. In the case of the vacuum vessel, a task on friction coefficient testing is envisaged while in the case of the TF coils, the quality of the welding procedure will be assessed.

martial

Recent Posts

Kilometres of pipes manufactured to cool down the core of ITER

Europe’s suppliers will use the tubes by DMV to shape the blanket manifolds.

1 day ago

Is Europe ready to lead the fusion energy race?

F4E Roundtable brings together policy makers, industry, SMEs, start-ups, and laboratories to shape tomorrow’s strategy.

2 weeks ago

European systems ready to power Japanese gyrotrons in JT-60SA

Integrated tests by F4E, QST, JEMA Energy achieved 1 MW of radio frequency power.

2 weeks ago

The F4E Fusion Observatory presents a report on private sector investment

Europe behind US in start-up market but leads in funding for the ITER supply chain.

3 weeks ago

The ITER Fast Discharge building is completed

F4E and European constructors also hand over the busbar bridges.

4 weeks ago

The foundations of IFMIF-DONES facility are laid

Japan joins the partnership as multilateral agreement progresses.

1 month ago