Components

“Helios” supercomputer to shed light on plasma physics

The “Helios” supercomputer will be composed of an impressive total of 49 racks.


The supercomputer that will be available to a scientific community of more than 1,000 European and Japanese fusion researchers in order to crack plasma physics has a name. “Helios”, from the Greek word which means sun, is expected to kick into operation in January 2012 and shed light on the analysis of experimental data on fusion plasmas, prepare scenarios for ITER operation, predict the performance of ITER and contribute to the DEMO and BA activities.

The first Call for proposals was launched on 1October and the deadline for submission is 1 December 2011. The Call is part of the IFERC activities which fall under the Broader Approach Agreement. To read more about the Call and the areas it covers click here.

The computer has already been entered into the race of the top 500 supercomputers and is expected to make it into the top 30 by 2012. With a computational power above 1 Petaflop, a memory exceeding 280 TB and high speed storage system exceeding 5 PB, the supercomputer will be at least 10 times more powerful than any existing system dedicated to simulations in the field of fusion in Europe and Japan.

The building to host “Helios” is located in Rokkasho, Japan, and some first images have been released. The upper floor of the building will accommodate the supercomputer in a room whose surface measures 640 m2. The massive cooling system for the electric feed of 3 million Watts consumed by the supercomputer will be located on the lower floor in a space of 900 m2 and will be supported by water chillers located outside the building.

To learn out more about the Broader Approach and its projects click here.

The cooling system that keeps temperatures to around 10°C


martial

Recent Posts

European factories in motion for ITER first wall panels

Fusion Business Leadership and Alsymex complete final tests for first pre-series units.

10 hours ago

Buildings ready to host ITER Neutral Beam power supplies

F4E and Demathieu Bard complete the construction of the two facilities.

5 days ago

F4E contract signed to deliver ITER assembly tools

Five suppliers will compete to support divertor, neutral beam and port plug handling systems.

2 weeks ago

Europe delivers all cold valve boxes for the ITER neutral beam cryopumps

F4E and Research Instruments complete the contract on schedule.

2 weeks ago

Investment in fusion private sector initiatives reaches 13 billion EUR

F4E Fusion Observatory report analyses competing models in US, China and Europe.

3 weeks ago

Multilateral International DONES Agreement signed

F4E, Spain, Japan, Croatia and Italy will cooperate to build IFMIF-DONES.

3 weeks ago