F4E Director, Henrik Bindslev, attended the official signing ceremony of the Framework Partnership Agreement (FPA) for the design of Diagnostic components for the ITER Plasma Position Reflectometry in Lisbon, Portugal. The ceremony celebratedthe FPA awarded by F4E to a consortium consisting of three EURATOM associations: Instituto Superior Técnico (IST), from Portugal; Centro de Investigaciones Energéticas, Medioambientales y Tecnológicas (CIEMAT), from Spain; and Consiglio Nazionale delle Ricerche, Istituto di Fisica del Plasma “Piero Caldirola” (IFP-CNR), from Italy.
The FPA concerns the design of the Plasma Position Reflectometry components (antennas, waveguides, microwave electronics and real-time analysis software) for the Diagnostics systems in the ITER machine. It covers R&D, engineering, quality support and managerial activities, and testing from functional specifications, up to the supply of an F4E-approved final design. This FPA will bring together the work of some 30 physicists and engineers per year.
Six reports are now available to guide R&D in Europe.
Students and early-career researchers learn from experts at the world’s largest tokamak.
F4E and AMW consortium manufacture their fifth sector.
Europe and Japan advance through commissioning and provide experience for DONES.
The high-level EU politician calls for Europe to lead the way to commercial fusion.
A look at Europe’s five sectors advancing through manufacturing and assembly.