

News
Filter by
-
How to detect a leak in ITER’s Vacuum Vessel from 2000 entry points?F4E collaborates with IDOM, 40-30 and Gutmar to develop a system.04.12.2020
-
Welding works in ITER Cryoplant nearly completedThe infrastructure to refrigerate the ITER superconducting magnets, cryostat and cryopumps is advancing.26.11.2020
-
How to spot the leaks in ITER’s vacuum systems?F4E is on a mission to detect and localise them.16.01.2019
-
Cryoplant equipment arrives at ITER Neutral Beam Test FacilityF4E and Air Liquide have started installing the cryogenic system of MITICA.
-
Europe installs all cryogenic tanks and cold boxes on the ITER siteThe Cryoplant now houses the impressive equipment and the first compressors.28.05.2018
-
Europe delivers all of its cryogenic tanks to ITERThe massive fridge of the biggest fusion machine is shaping up.23.10.2017