

News
Filter by
- ITER Cryoplant passes pressure testsLast big milestone before completing mechanical works.30.03.2021
- How to detect a leak in ITER’s Vacuum Vessel from 2000 entry points?F4E collaborates with IDOM, 40-30 and Gutmar to develop a system.04.12.2020
- Welding works in ITER Cryoplant nearly completedThe infrastructure to refrigerate the ITER superconducting magnets, cryostat and cryopumps is advancing.26.11.2020
- How to spot the leaks in ITER’s vacuum systems?F4E is on a mission to detect and localise them.16.01.2019
- Cryoplant equipment arrives at ITER Neutral Beam Test FacilityF4E and Air Liquide have started installing the cryogenic system of MITICA.
- Europe installs all cryogenic tanks and cold boxes on the ITER siteThe Cryoplant now houses the impressive equipment and the first compressors.28.05.2018