

News
Filter by
-
Contract signed for ITER emergency electrical powerAnsaldo Nucleare and Monsud to develop system and infrastucture.11.01.2021
-
-
All port cell doors installed inside the ITER castleA total of 46 barriers will separate the machine from the rest of the Tokamak building.10.07.2020
-
Tokamak building ready to receive massive componentsEurope paves the way for the assembly of the ITER device.26.03.2020
-
End of civil engineering works for Tokamak buildingFinal concrete pour by VINCI, Ferrovial, Razel-Bec at key ITER facility.18.11.2019
-
Steel giants arrive on ITER siteThe massive roof pillars of the Tokamak building are here.20.05.2019