

News
Filter by
-
LIPAc accelerator prepares for beam operationNew central control room installed to operate the system.04.05.2021 -
Europe and Japan develop new tools to remotely follow up LIPAcHow engineers from two parts of the world found shortcuts to make progress in spite of COVID-19 restrictions.22.01.2021 -
A step closer to the qualification of LIPAcChecking the equipment and setting up the team to operate the accelerator on a continuous beam for 30 min.21.04.2020 -
Europe and Japan celebrate major milestone in validating LIPAcComponents of the world’s highest beam perveance accelerator pass tests.05.08.2019 -
Beam operations resume at LIPAcDelegates from Europe and Japan follow the action from the control room.13.05.2019 -
IFMIF/EVEDA – Engineering and validation of equipment in progressThe experimental facility hosting the world’s longest Radio Frequency Quadrupole (RFQ) accelerator prepares for upgrades.11.02.2019