RSS Feeds Twitter LinkedIn YouTube Flickr
Media Corner

News

28 February 2013
Four experts guide us through Europe's winding packs facility.
28 January 2013
A new set of images documenting the works on the ITER site and our latest video are now available!
15 January 2013
One of F4E’s largest contracts in the area of the civil engineering works for the construction of the Tokamak complex is signed.
19 December 2012
F4E has awarded the FPA for the design of Diagnostic components for the ITER Plasma Position Reflectometry to three EURATOM associations.
18 December 2012
The signing is a positive milestone in F4E’s efforts to encourage European industry’s know-how in this specialised field of technology.
18 December 2012
The first component of the Linear IFMIF Prototype Accelerator (LIPAc) presently under construction has passed the acceptance tests
17 December 2012
A variety of civil engineering works delivering roads, lighting, drainage and trenches kick off. The ITER site gets transformed.
17 December 2012
View our latest clip reporting on the works at the Tokamak complex area, the Assembly Hall and the contractors’ area.
14 December 2012
F4E has awarded several procurement contracts allowing for manufacturing of necessary components to move full-speed ahead.
05 December 2012
One of the largest industrial contracts has been signed between F4E and the Consortium of SIMIC and CNIM